Hot Stamping Machine For PVC/ABS Glass Profiles

OTR50 Model Online Hot Stamping Machine Hot stamping machine for PVC/ABS glass profiles Hot wrapping machine for PVC/ABS glass profiles Heat transfer machine for PVC glass profiles Silver film wrapping machine for PVC glass profiles Wuxi Yuda Light Industry Machinery Factory Wuxi, China Part 1....
Chat Now

Product Details

OTR50 Model Online Hot Stamping Machine  


Hot stamping machine for PVC/ABS glass profiles

Hot wrapping machine for PVC/ABS glass profiles

Heat transfer machine for PVC glass profiles

Silver film wrapping machine for PVC glass profiles


_5  

_8_6

 

Wuxi Yuda Light Industry Machinery Factory

Wuxi, China

 

Part 1. Application:

 This hot stamping machine is special designed for decorating various PVC/PS/WPC/ABS/PVC foaming small profiles within 50mm widths ;

 For this machine, its special used for stamping 4surfaces of profiles from top, bottom and both sides, special for ABS profiles for glass;

 The wall thickness of PVC profiles should be strong, or it can not bear high temperature;

 It is installed on the extrusion line, before Haul-off machine and after calibration table;

 The center height of machine is 1000mm per center height of extrusion line. 


Part 2. The FOB shanghai price of OTR50 model online hot stamping M/C is        


Part 3. The technical parameter of machine:

  

Items

Technical Parameters

OTR50 Type Hot Stamping Machine

Max width of thermoprinting

50mm 

for top&bottom surface of stamping heads

The speed of thermoprinting  

1—10 m/min ( adjustable)

Thickness of panels  

5—50 mm

Drive power  

25W*4=100w

heating power  

1.5*4=6kw by stainless steel heating loop

The total power  

6.1 KW

Power source  

220V/380V 50 Hz

Total weight  

≈800Kg

Center height

1000mm

Visual sizes  

(L*W*H) 2400 × 1500× 1750 mm

Temperature controller

omron

Contactor+switches

Siemens


Part 4:  Basic assembly of OTR50


4.1) Transmitting unit

① The whole machine adopts rectangle steel and Q235 steel plate to weld.

② It adopts angle iron to make conveying table.

③ It adopts cast iron wrapped with nylon to make conveying wheel.

④ It adopts nylon to control the width of board.

4.2)  The angle adjustment unit

① It adopts Q235 steel plate to make base-plate, clipboard and joint-plank.

② It adopts Q235 steel plate to make big circle wheel.

③ It adopts 160 hand-wheel to adjust thermo-stamping angle by worm wheel and worm.


4.3)  The head of stamping control unit

① It adopts Q235 steel plate to make erect plank, plank of air cylinder; and 63*150 air cylinder to control the stamping head work back and forth.

② It adopts ZL102 with the copper slipcover to make guide thimble, and 45 steel for guide pole.

③ It adopts ZL102 to make slide seat, 45 steels for slide shaft and flat steel to make index plate.


4.4) The stamping/embossing head unit

① It adopts ZL102 to make base-plate of thermo-stamping which connect between slide shaft and slide seat.

② It adopts ZL102 to make heating cover and stainless steel heating pump(1.5w/pc) for heating, the temperature is controlled by TC Panel.

③ It adopts ZL102 wrapped with anti high temperature silicon rubber to make stamping wheel.

④ It adopts 25w gear speed-down motor to drive stamping roller by gears.


4.5) unwinding unit

① It adopts 45# steel to make shaft and Q235 to make joint plate.

② It adopts organic glass to make clamp for clamping film and aluminum loop to make fixed components.

③ It adopts 25w electronic timing gear speed-down motor to drive winding shaft by gears.

④ It adopts Q235 to make joint plate and 45# light&round steel to make shaft of guiding film.


4.6)  Electric control unit

① It adopts cold rolled steel to make electric container.

② The electric components of equipment adopts famous brand in home market.


Part 5. Flow chart of OTR4100

_10 


Part 6. Payment and Delivery time

1) Delivery time: Approx. 35days from receipt of down payment.

2) Payment: 30% advance payment with order by T/T;

70% balance payment paid before shipment by T/T.

3) Guarantee: the machine is under warranty for one year, but not including the artificial wrong operation.

4) Assembling works: Machine can be installed and start up will be done by our technician at your workshop. This period will not exceed 5 days including the training of your 2 people. For this service a round trip airplane ticket (economy class) and accommodation& food expenses of our technician will be borne by you, and offer 100USD/day as technical subsidy for our technician.


Inquiry